Formed in 2001, Phoenix CNC specialises in the machining of multi axis airframe components and sub-assemblies in hard, soft and exotic materials. With over 30 CNC machine tools, including a state of the art lights out machining facility, ASG Phoenix CNC is a recognised strategic supplier of quality components, always on time and at a competitive price.
ASG Phoenix CNC also has a dedicated speed shop/AOG, supporting our customers with best in class customer service, backed by operational excellence. Our team is on standby to support our customers 24/7.
ASG Phoenix CNC is currently involved in the SC21 programme, signed up in 2018, achieving Bronze level status in 2021 and maintaining the award in 2023.
24 hour contact
Turning capability
Sub assembly capability
Consignment stock on Airbus common materials
Soft metal / hard metal surface treatment
5 AXIS machining capability
Dedicated transport
Shot peen
Programming
Capabilities
-
Machine Tool Dmc 63v Machining Centre
• Capacity 630mm X 400mm X 550mm
• Speed 15000rpm
• Control Heid426
• Year 2001Machine Tool Dmc 63v Machining Centre
• Capacity 630mm X 400mm X 550mm
• Speed 15000rpm
• Control Heid426
• Year 2002Machine Tool Haas Vf3ss Machining Centre
• Capacity 1000mm X 750mm X 500mm
• Speed 15000rpm
• Control Fanuc
• Year 2016Machine Tool Haas Vf2ss Machining Centre
• Capacity 800mm X 600mm X 400mm
• Speed 15000rpm
• Control Fanuc
• Year 2016Machine Tool Haas Vf5 Machining Centre
• Capacity 1250mm X 700mm X 600mm
• Speed 10000rpm
• Control Fanuc
• Year 2009Machine Tool Haas Super Minimill
• Capacity 400mm X 300mm X 250mm
• Speed 10000rpm
• Control Fanuc
• Year 2010Machine Tool Haas Minimill
• Capacity 406mm X 305mm X 254mm
• Speed 6000rpm
• Control Fanuc
• Year 2006Machine Tool Haas Minimill
• Capacity 406mm X 305mm X 254mm
• Speed 6000rpm
• Control Fanuc
• Year 2003Machine Tool Haas Minimill
• Capacity 406mm X 305mm X 254mm
• Speed 6000rpm
• Control Fanuc
• Year 2004Machine Tool Hardinge Vmc1000
• Capacity1 000mm X 500mm X 254mm
• Speed 8000rpm
• Control Fanuc
• Year 2000 -
Machine Tool Zimmermann FZU
• Capacity 2000mm X 3000mm X 1250mm
• Speed 24000rpm
• Control Heid640
• Year 2021
• Comments Full 5 Axis Simultaneous MachiningMachine Tool DMU 60 EVO Machining Centre
• Capacity 440mm X 440mm X 500mm
• Speed 18000rpm
• Control Heid530i
• Year 2018
• Comments Full 5 Axis Simultaneous Machining
• 10 Pallet PH150 Pallet ChangerMachine Tool DMU 60 EVO Machining Centre
• Capacity 440mm X 440mm X 500mm
• Speed 18000rpm
• Control Heid530i
• Year 2018
• Comments Full 5 Axis Simultaneous Machining
• 10 Pallet PH150 Pallet ChangerMachine Tool DMU 60 EVO Machining Centre
• Capacity 440mm X 440mm X 500mm
• Speed 18000rpm
• Control Heid530i
• Year 2018
• Comments Full 5 Axis Simultaneous Machining
• 10 Pallet PH150 Pallet ChangerMachine Tool DMU 70 EVO Machining Centre
• Capacity 720mm X 500mm X 500mm
• Speed 18000rpm
• Control Heid530i
• Year 2008
• Comments Full 5 Axis Simultaneous MachiningMachine Tool HAAS VMC750 Monoblock
• Capacity 750mm X 650mm X 50mm
• Speed 12000rpm
• Control Fanuc
• Year 2016
• Comments Full 5 Axis Simultaneous MachiningMachine Tool DMU 50 EVO Machining Centre
• Capacity 506mm X 400mm X 400mm
• Speed 18000rpm
• Control Heid530i
• Year 2006
• Comments Full 5 Axis Simultaneous MachiningMachine Tool DMU 65 Monoblock
• Capacity 650mm X 650mm X 560mm
• Speed 10000rpm
• Control Heid530
• Year 2012
• Comments Full 5 Axis Simultaneous MachiningMachine Tool DMU 95 Monoblock
• Capacity 950mm X 950mm X 750mm
• Speed 20000rpm
• Control Heidenhain
• Year 2016
• Comments Full 5 Axis Simultaneous MachiningMachine Tool DMU 75 Monoblock
• Capacity 750mm X 750mm X 650mm
• Speed 20000rpm
• Control Heidenhain
• Year 2016
• Comments Full 5 Axis Simultaneous MachiningMachine Tool ECO 70 Monoblock
• Capacity 750mm X 600mm X 500mm
• Speed 20000rpm
• Control Heidenhain
• Year 2016
• Comments Full 5 Axis Simultaneous MachiningMachine Tool ECO 50 Monoblock
• Capacity 550mm X 450mm X 350mm
• Speed 12000rpm
• Control Heidenhain
• Year 2015
• Comments Full 5 Axis Simultaneous MachiningMachine Tool HAAS VMC750 Monoblock
• Capacity 750mm X 650mm X 50mm
• Speed 12000rpm
• Control Fanuc
• Year 2016
• Comments Full 5 Axis Simultaneous Machining -
Machine Tool Mitutoyo BHN506 CNC CMM
• Capacity 1500mm X 400mm X 400mm
• Control Hexagon PC DMIS 2018 Upgrade
• Year 2009
• Comments Full CNC CMMCMM Mitutoyo BHN715 CNC CMM
• Capacity 1500mm X 700mm X 900mm
• Control Hexagon PC DMIS 2017 Upgrade
• Year 2009
• Comments Full CNC CMMFaro Arm Prime
• Capacity 1200mm Reach
• Control Polyworks SoftwareMitutoyo Linear Height Gauge
Mitutoyo Shadowgraph Pj-A3000
-
Machine Tool Hardinge T42 Turning Centre
• Capacity 42mm Dia
• Speed 4000 rpm
• Control Fanuc Control
• Bar FeedMachine Tool HAAS Sl30 Turning Centre
• Capacity 76mm Dia
• Speed 5000 rpm
• Control Fanuc Control
• Live Tooling
• Bar FeedMachine Tool HAAS SL10 Turning Centre
• Capacity 45mm Dia
• Speed 5000 rpm
• Control Fanuc Control -
Estimating and Quotations
Sales Order Processing
Engineering Planning
Scheduling
Purchasing
Shop floor data capture
Sub-contract control
Material traceability
Capacity planning
Business reporting/KPI’s
Frequently Asked Questions
-
3-axis machine centres, also known as 3-axis machining centres or milling machines, are precision machining tools used in manufacturing and prototyping processes. The term "3-axis" refers to the three-dimensional movement capabilities of the machine along three mutually perpendicular axes: X, Y, and Z. Here's a brief overview of each axis:
X-axis: Horizontal movement from left to right or vice versa. The X-axis represents the longitudinal movement of the machine.
Y-axis: Horizontal movement from front to back or vice versa. The Y-axis represents the lateral movement of the machine.
Z-axis: Vertical movement up and down. The Z-axis represents the vertical movement of the machine.
These three axes allow for precise control over the position and depth of the cutting tool, enabling the machine to create complex and intricate shapes on a workpiece. 3-axis machining centres are commonly used in various industries, including aerospace, automotive, electronics, and general machining, for tasks such as milling, drilling, and engraving.
It's worth noting that there are also machines with more axes, such as 4-axis and 5-axis machining centers, which offer additional rotational movements around specific axes. These extra axes provide increased flexibility for machining more complex geometries and reducing the need for multiple setups.
-
3-axis CNC machining offers several advantages, making it a versatile and widely used technology in various manufacturing industries. Here are some key advantages:
Simplicity and Cost-Effectiveness
Ease of Programming: The programming of 3-axis CNC machines is generally simpler compared to machines with more axes. Many operators and programmers are familiar with 3-axis systems, making it easier to find skilled personnel.Lower Costs: 3-axis CNC machines are often more affordable than machines with additional axes, both in terms of initial investment and ongoing maintenance.
Versatility
Wide Range of Applications: 3-axis CNC machines are suitable for a broad range of applications, including milling, drilling, and engraving. They can handle a variety of materials, making them versatile for different industries.Ease of Use
User-Friendly: The operation of 3-axis CNC machines is relatively straightforward, making them accessible to operators with varying levels of experience. This ease of use contributes to increased productivity.High Precision
Accurate Machining: 3-axis machines are capable of high-precision machining, ensuring tight tolerances and excellent repeatability. This precision is crucial for industries that require accurate and consistent parts.Reduced Set-Up Time
Simplified Set-Up: Setting up a 3-axis CNC machine is generally quicker and simpler than setting up machines with more axes. This can lead to shorter lead times for production runs.Widespread Availability of Tooling
Standard Tooling: Standard tooling and accessories are widely available for 3-axis machines, contributing to cost-effectiveness and ease of tool replacement.Proven Technology
Reliability: 3-axis CNC machining is a well-established and reliable technology. Manufacturers have been using these machines for decades, and they have a proven track record of delivering consistent results.While 3-axis CNC machining has these advantages, it's important to note that for more complex geometries and intricate designs, higher-axis machines (such as 4-axis and 5-axis) may be necessary to achieve certain machining tasks efficiently. The choice between different axis configurations depends on the specific requirements of the project.
-
Lights out machining refers to a manufacturing process in which CNC (Computer Numerical Control) machines operate without the need for direct human intervention. The term "lights out" is derived from the idea that the facility can essentially turn off the lights and continue production without human presence. This concept relies on automation and advanced technologies to enable continuous and unmanned machining operations.
Key characteristics of lights out machining include
Automation: Lights out machining heavily relies on automated systems, including CNC machines, robotic loaders, tool changers, and other peripherals. These systems work together seamlessly to perform various manufacturing tasks without the need for constant human oversight.Unmanned Operation: Once the machining process is set up and initiated, human operators are not required to be present for the duration of the production run. This can lead to increased efficiency, reduced labour costs, and the ability to run production continuously, including overnight and during weekends.
Advanced Monitoring and Control Systems: Lights out machining often involves sophisticated monitoring and control systems. These systems can include sensors, cameras, and software that allow operators to remotely monitor the status of the machines, detect issues, and make adjustments as needed.
Optimised Workflow: Lights out machining is particularly suitable for repetitive and high-volume production runs where the workflow can be optimised for efficiency. It helps minimise downtime between batches and ensures a more continuous production cycle.
Reduced Lead Times: By allowing machines to run continuously, lights out machining can contribute to reduced lead times for production orders. This is especially beneficial for industries with demanding production schedules.
Cost Savings: Lights out machining can result in cost savings by minimizing labour costs, maximizing machine utilisation, and reducing the need for manual intervention. It can lead to improved productivity and competitiveness in the manufacturing sector.
While lights out machining offers significant advantages in terms of efficiency and cost savings, it also presents challenges. Advanced planning, robust automation systems, and reliable monitoring are essential to ensure the successful implementation of lights out operations. Additionally, the suitability of lights out machining depends on the specific requirements of the manufacturing process and the complexity of the parts being produced.
-
5-axis CNC machining is a sophisticated manufacturing process that involves the use of a computer numerical control (CNC) machine with five axes of motion. Unlike 3-axis machining, which operates along the X, Y, and Z axes, 5-axis machining adds two more rotational axes—usually referred to as A and B or sometimes called the rotary axes. These additional axes allow the cutting tool to move in multiple directions, providing greater flexibility and the ability to produce more complex and intricate geometries.
The five axes in a 5-axis CNC machine are typically defined as follows:
X-axis: Horizontal movement from left to right or vice versa.
Y-axis: Horizontal movement from front to back or vice versa.
Z-axis: Vertical movement up and down.
A-axis: Rotation around the X-axis, allowing the cutting tool to tilt.
B-axis: Rotation around the Y-axis, enabling the cutting tool to swivel.
The combination of linear and rotational movements allows the cutting tool to approach the workpiece from multiple angles, making it possible to machine complex surfaces and contours in a single setup. This capability is especially valuable in industries such as aerospace, automotive, and medical, where parts with intricate shapes and tight tolerances are common.
-
Key advantages of 5-axis CNC machining include
Increased Precision: The ability to approach the workpiece from various angles enhances precision and accuracy, especially when machining complex contours.Reduced Set-Up Time: With 5-axis machining, multiple sides of a part can be machined in a single setup, reducing the need for repositioning and fixture changes.
Versatility: 5-axis machines are versatile and can handle a wide range of part geometries without the need for multiple setups.
Enhanced Surface Finish: The multi-axis movement allows for better tool engagement, resulting in improved surface finishes on the machined parts.
Efficiency in Production: 5-axis machining can increase efficiency by reducing the number of setups required for complex parts, ultimately reducing production time.
While 5-axis CNC machining offers numerous advantages, it also requires a higher level of programming and expertise. The complexity of the machines and the need for precise toolpath planning make it essential for operators and programmers to have a deep understanding of the technology.
-
CMM capability refers to the performance and accuracy of a Coordinate Measuring Machine (CMM) in measuring and inspecting geometric features of manufactured parts. A CMM is a specialised device used in manufacturing and quality control processes to measure the dimensions, angles, and shapes of objects with high precision. The capability of a CMM is influenced by various factors, and understanding these capabilities is crucial for ensuring accurate and reliable measurements. Here are some key aspects of CMM capability:
Accuracy: Accuracy is a measure of how closely the measured values obtained by the CMM match the true or nominal values of the measured features. CMM accuracy is affected by factors such as the machine's design, calibration, environmental conditions, and the quality of its components.
Repeatability: Repeatability refers to the ability of the CMM to produce consistent measurements when measuring the same part repeatedly. A CMM with high repeatability will provide similar results each time it measures the same part under the same conditions.
Resolution: Resolution is the smallest incremental movement that a CMM can detect. Higher resolution allows the CMM to measure finer details and features. It is an important factor when measuring small or intricate components.
Probing System: The probing system of a CMM includes the type of probe used and its capabilities. Different probes are designed for specific measurement tasks, such as touch-trigger probes for discrete point measurements or scanning probes for continuous surface measurement.
Software Capabilities: The software used to control and analyse data from the CMM plays a crucial role in its capability. Modern CMM software allows for advanced measurement strategies, geometric dimensioning and tolerancing (GD&T) analysis, and statistical process control.
Environmental Conditions: The operating environment, including temperature, humidity, and cleanliness, can affect CMM performance. Some CMMs are equipped with environmental monitoring systems to compensate for changes in conditions.
Machine Stability: The stability of the CMM structure and its components is critical for maintaining accuracy. Factors such as thermal stability and rigidity of the machine contribute to its overall capability.
Calibration and Maintenance: Regular calibration and maintenance are essential for ensuring that a CMM continues to operate within specified tolerances. Calibration helps verify the accuracy of measurements and correct any deviations.
CMM capability is typically expressed in terms of its uncertainty or the range within which measurements are expected to be accurate. Understanding the capability of a CMM is crucial for establishing confidence in the metrology processes and ensuring that manufactured parts meet specified quality standards. Manufacturers often perform capability studies to assess and document the performance of their CMMs in real-world applications.
-
Shot peening is a metalworking process used to enhance the fatigue resistance and strength of metal components, primarily in industries such as aerospace, automotive, and manufacturing. The process involves bombarding the surface of a metal part with small, spherical media particles, typically made of steel, glass, or ceramic. These particles are called "shot."
Key features of shot peening include
Purpose: The primary purpose of shot peening is to induce compressive residual stresses on the surface of a metal component. This is achieved by the repeated impacts of the shot particles, which create small indentations or dimples on the material's surface.Material Selection: The choice of shot material depends on the specific application and the properties desired for the treated component. Common shot materials include steel, glass beads, ceramic beads, and sometimes other materials.
Process Overview
Preparation: The metal component to be treated is thoroughly cleaned to remove any contaminants or scale from its surface.Masking: In some cases, areas that should not be peened may be masked to protect them from the shot.
Peening: The component is placed in a shot peening machine, and the shot is propelled at high velocity onto the surface using compressed air or centrifugal force.
Coverage: The shot impacts the surface, creating small dimples or indentations. The goal is to achieve complete coverage of the surface while avoiding over-peening, which could lead to material damage.
-
Benefits
Residual Stress: Shot peening induces compressive residual stresses in the treated material, improving its resistance to fatigue and preventing the initiation and propagation of cracks.Improved Strength: The process can enhance the strength and load-bearing capacity of components.
Surface Hardening: Shot peening can also contribute to surface hardening, increasing wear resistance.
Applications
Aerospace: Shot peening is commonly used in the aerospace industry to enhance the fatigue life of critical components such as turbine blades, landing gear, and engine parts.Automotive: Automotive applications include the treatment of various engine and transmission components to improve durability.
General Manufacturing: Shot peening is applied to a wide range of metal components in general manufacturing to improve their performance under cyclic loading.
Shot peening is a controlled process that requires careful consideration of parameters such as shot size, intensity, and coverage to achieve the desired results. It is an effective method for extending the life and reliability of metal parts subjected to fatigue and stress in various industrial applications.
-
CNC turning and CNC milling are two distinct machining processes, each suited for specific types of workpieces and applications. Here are the key differences between CNC turning and CNC milling:
Process Orientation
CNC Turning: Turning is a process that involves rotating a workpiece while a cutting tool is traversed along it to remove material and create cylindrical shapes. The workpiece is held in a chuck and rotates on its axis. This process is ideal for creating cylindrical or conical shapes, such as shafts, pins, and bushings.CNC Milling: Milling is a process that involves removing material from a workpiece using rotating cutting tools. The workpiece remains stationary, while the milling machine's spindle and cutting tools move in multiple directions to shape the material. Milling is suitable for creating a wide range of shapes, including flat surfaces, slots, and complex three-dimensional contours.
Tool Movement
CNC Turning: In turning, the cutting tool moves parallel to the axis of rotation of the workpiece. The tool is fed along the length of the rotating workpiece to remove material and shape it.CNC Milling: In milling, the cutting tool can move along the X, Y, and Z axes. This multi-directional movement allows for the creation of intricate shapes and features on the workpiece.
Workpiece Shapes
CNC Turning: Turning is well-suited for producing cylindrical or rotationally symmetric parts. It is commonly used for creating components like shafts, bolts, and bushings.CNC Milling: Milling is versatile and can be used to create a wide range of shapes, including complex contours, pockets, slots, and intricate three-dimensional geometries.
Typical Applications
CNC Turning: Turning is often used for parts with rotational symmetry, such as components in the automotive industry (e.g., crankshafts) and in the production of round or tubular components.CNC Milling: Milling is employed for a broad range of applications, including the production of flat and contoured surfaces in aerospace, mould making, and general machining.
Machine Configuration
CNC Turning: Turning machines, also known as lathes, are configured to hold and rotate the workpiece while the cutting tool moves along the length of the part.CNC Milling: Milling machines are equipped with a stationary worktable, and the cutting tool moves in different directions to shape the workpiece. CNC milling machines may be vertical or horizontal, depending on the orientation of the spindle.
In summary, CNC turning is best suited for producing cylindrical or rotationally symmetric parts, while CNC milling is more versatile and suitable for creating a wide range of shapes, including complex three-dimensional geometries. The choice between turning and milling depends on the specific requirements of the part and the desired features of the final product.
Contact Us
Phoenix CNC, Acton Road, Long Eaton, Nottingham NG10 1FU, United Kingdom
Phone
+44 (0)115 946 9896
Policies
-
1. Certificate of Conformity must accompany all deliveries.
2. When requested, Material Mill and Test Certificates must accompany all deliveries.
3. When requested, a First Article Inspection Report to AS9102 must accompany all deliveries.
4. If the supplier does not have all of the necessary documentation at the requested revision level of this order, a formal request must be made to the named buyer on this order.
5. Non-conforming material. The Supplier shall immediately notify Phoenix of any parts or material believed to be non-conforming and obtain approval for disposition. This includes parts already delivered.
6. Change in product or process. The Supplier shall notify Phoenix of any changes to product or processes applicable to this purchase, including change of manufacturing location or next tier supplier.
7. Rights of access. The Quality Assurance representatives of Phoenix, its customers and appropriate regulatory authorities reserve the right to verify at source that the purchased product and processes conform to order requirements. Quality records relating to product and or process shall be made available as required.
8. Sub-tier suppliers. Sub-tier suppliers shall not be used without the prior agreement of Phoenix. The Supplier shall flow down the requirements of this Purchase Order to any sub-tier supplier.
9. Record retention. Quality Records shall be protected and not disposed of without prior agreement of Phoenix.
10. Suppliers to certify that all materials incorporated into the final product were sourced, processed and manufactured in compliance with the human trafficking and slavery laws of the country or countries in which they operate.
11. Inducements and Anti Bribery. The supplier shall not:
12. Induce any employee of the purchaser to make any concessions to the supplier in return for any gift, money or other inducement.
13. Pay money or give any other benefit to any third party (either directly or indirectly) in connection with the issue of the order.
14. Encourage an employee of the purchaser to commit any act of dishonesty against the purchaser.
-
1. Basis of Contract
1.1. Your order constitutes an offer by you to purchase goods (Goods) and/or services (Services) in accordance with these terms and conditions (Conditions) and any terms set out in our quotation form or Order Acknowledgement.
1.2. Your order shall only be deemed to be accepted when we issue an Order Acknowledgement at which point and on which date a formal Order exists as a contract between you and us (being ASG Aerospace or any of its subsidiaries from time to time as set out in the Order Acknowledgement) in accordance with these Conditions (Contract). For the avoidance of doubt we shall not be required to accept Orders which you place and any acceptance shall be at our sole discretion.
1.3. The Contract constitutes the entire agreement between us. You acknowledge that you have not relied on any statement, promise or representation made or given by or on behalf of us which is not set out in the Contract.
1.4. Any samples, drawings, descriptive matter or advertising issued by us and any descriptions of the Goods or illustrations or descriptions of the Services contained in any documents forwarded to you are issued or published for the sole purpose of giving an approximate idea of the Services and/or Goods described in them. They shall not form part of the Contract or have any contractual force except where expressly provided in these Conditions or expressly incorporated in our Order Acknowledgement.
1.5. These Conditions apply to the Contract to the exclusion of any other terms that you seek to impose or incorporate (including any terms previously issued by you), or which are implied by trade, custom, practice or course of dealing.
1.6. Any quotation given by us shall be subject to the Conditions but shall not constitute a legally binding offer capable of acceptance by you. Any quotation is only valid for a period of 30 days from its date of issue.
1.7. All of these Conditions shall apply to the supply of both Goods and Services except where application to one or the other is specified
2. Supply of Goods
2.1. We shall supply you with the Goods of the type and in the quantities described in the Order or where applicable as more particularly set out in a specification document attached or referred to in the Order (Goods Specification). The Goods Specification may include detailed drawings, sketch drawings and/or first article parts.
2.2. Subject to payment by you of the price in full, we warrant that on delivery, and for a period of 12 months from the date of delivery to you in accordance with these conditions (Warranty Period), the Goods shall:
a) conform in all material respects with any relevant Goods Specification; and
b) conform in all material respects with any samples or red banded masters supplied by you agreed between you and us in writing.
2.3. Unless otherwise stated in the Order we shall not be obliged to provide any post-delivery support in relation to the Goods, nor shall we be responsible for any form of airworthiness certification. Any certificate of conformity provided by us in relation to the Goods shall not operate so as to extend the scope of the warranties set out in these Conditions.
2.4. Subject to the warranties provided in clause 2.2, all other warranties, express or implied are to the fullest extent permitted by law excluded from the Contract.
2.5. Subject to clause 2.7, if:
a) you give notice in writing during the Warranty Period within 7 days of discovery that some or all of the Goods do not comply with the warranty set out in clause 2.2; and
b) we are given a reasonable opportunity of examining such Goods; and
c) you (if asked to do so by us) return such Goods to our place of business at your cost, we shall, at our option, repair or replace the defective Goods, or refund the price of the defective Goods in full.
2.6. Except as provided in clause 2.5 above, we shall have no liability to you in respect of the Goods' failure to comply with the warranty set out in clause 2.2.
2.7. We shall not be liable for the Goods' failure to comply with the warranty in clause 2.2 if:
a) you make any further use of such Goods after giving a notice in accordance with clause 2.5;
b) the defect arises because you failed to follow our oral or written instructions as to the storage, installation, commissioning, use or maintenance of the Goods or in the absence of such instruction you fail to store, install, commission, use or maintain the Goods in accordance with best industry practice;
c) the defect arises as a result of us following any drawing, design process or Goods Specification supplied or agreed by you;
d) you alter or repair such Goods without our written consent;
e) the defect arises as a result of fair wear and tear, wilful damage, negligence, or abnormal working conditions.
2.8. These Conditions shall apply to any repaired or replacement Goods supplied by us under clause 2.5.
3. Indemnity
3.1. To the extent that the Goods or any part of the Goods are to be manufactured in accordance with:
a) any information, specifications or requirements provided to us by you (including, where provided by you, the Goods Specification); or
b) samples or red banded masters agreed between you and us in writing, you shall indemnify us against all liabilities, costs, expenses, damages and losses (including any direct, indirect or consequential losses, loss of profit, loss of reputation and all interest, penalties and legal and other professional costs and expenses) suffered or incurred by us in connection with any claim made against us arising out of or in connection with the use of the Goods, including but not limited to actual or alleged infringement of a third party's intellectual property rights. This clause 3.1 shall survive termination of the Contract.
4. Delivery of Goods
4.1. Unless otherwise set out in the Order, delivery shall take place EX WORKS INCOTERMS 2010 at the premises of the ASG Aerospace company set out in the Order (Delivery Location) and at any time we notify you that the Goods are ready
4.2. Delivery of the Goods shall be completed on the Goods' arrival at the Delivery Location or their being made available to you at the Delivery Location where delivery takes place EX WORKS INCOTERMS 2010.
4.3. Any dates quoted for delivery of the Goods are approximate only, and the time of delivery is not of the essence. We shall not be liable for any delay in delivery of the Goods that is caused by a Force Majeure Event or your failure to provide us with adequate delivery instructions or any other instructions that are relevant to the supply of the Goods.
4.4. If we fail to deliver the Goods and such failure is not caused by you or an event of Force Majeure as described at clause 15.1 below then we shall have no liability to you unless we are in excess of 30 days late.
4.5. If you fail to accept or take delivery of the Goods within 7 days of us notifying you that the Goods are ready, then except where such failure or delay is caused by our failure to comply with our obligations under the Contract in respect of the Goods:-
a) delivery of the Goods shall be deemed to have been completed at 9.00 am 2 days following the day on which we notified you that the Goods were ready; and
b) we shall store the Goods until you are able to take physical possession of the Goods, and charge you for all related costs and expenses (including insurance).
4.6. If 7 days after we notified you that the Goods were ready for delivery you have not accepted or taken delivery of them, we may resell or otherwise dispose of part or all of the Goods and may charge you for any shortfall below the price of the Goods in addition to any other losses we suffer.
4.7. You shall not be entitled to reject the Goods if we deliver up to and including 5percent more or less than the quantity of Goods ordered, but a pro-rata adjustment shall be made to the Order invoice on receipt of notice from you that the wrong quantity of Goods was delivered. Any notification or shortfall beyond the scope of the parameters referred to above must be notified to us within 7 days of delivery.
4.8. We may deliver the Goods by instalments, which shall be invoiced and paid for separately. Each instalment shall constitute a separate contract. Any delay in delivery or defect in an instalment shall not entitle you to cancel any other instalment
5. Title and Risk
5.1. The risk in the Goods shall pass to you on completion of delivery.
5.2. Title to the Goods shall not pass to you until we have received payment in full (in cash or cleared funds) for:
a) the Goods; and
b) any other goods that we have supplied to you in respect of which payment has become due.
5.3. Until title to the Goods has passed to you, you shall:
a) hold the Goods on a fiduciary basis as our bailee;
b) store the Goods separately from all other goods held so that they remain readily identifiable as our property;
c) not remove, deface or obscure any identifying mark or packaging on or relating to the Goods;
d) maintain the Goods in satisfactory condition and keep them insured against all risks for their full price on our behalf from the date of delivery;
e) notify us immediately if you become subject to any of the events listed in clause 12.1(b) to clause 12.1(j); and
f) give us such information relating to the Goods as we may require from time to time, but you may resell or use the Goods in the ordinary course of your business. 5.4 If before title to the Goods passes to you, you become subject to any of the events listed in clause 12.1(b) to clause 12.1(j), or we reasonably believe that any such event is about to happen and notify you accordingly, then, provided the Goods have not been resold, or irrevocably incorporated into another product, and without limiting any other right or remedy we may have, we may at any time require you to deliver up the Goods and, if you fail to do so promptly, enter any of your premises or the premises of any third party where the Goods are stored in order to recover them.
6. Rework & Refurbishment Services & Modifications and Reworked Parts
6.1. We shall provide the Services to you in all material respects in accordance with the Order and/or where relevant as more particularly set out in a specification document attached or referred to in the Order (Services Specification). The Services Specification may include detailed drawings, sketch drawings, process descriptions and any other relevant information relating to the Services.
6.2. The Services which we provide to you may relate to the reworking or refurbishment of third party parts or components and we accept no liability whatsoever for any third party parts or components. Our liability shall extend solely to the provision of the Services.
6.3. Where we return third party parts or components to you following completion of the Services then for the purposes of the Contract (subject always to clause 6.2) they shall be considered Goods for the purposes of the following clauses of these Conditions: - 4.1, 4.2, 4.3, 4.5, 4.7, 12.3, 13(e).
6.4. We shall use our reasonable endeavours to meet any performance dates and/or delivery dates for the Services specified in the Order or the Service Specification, but any such dates shall be estimates only and time shall not be of the essence for the performance of the Services.
6.5. We shall have the right to make any changes to the Services which are necessary to comply with any applicable law or safety requirement, or which do not materially affect the nature or quality of the Services, and we shall notify you in any such event.
6.6. We warrant to you that the Services will be provided using reasonable care and skill but shall have no liability whatsoever in relation to any breach of warranty in respect of the Services where such breach arises as a result of your actions in whole or in part including but not limited to any defect in the Services Specification or any Customer Default.
7. Your Obligations
7.1. You shall:
a) ensure that the terms of the Order (including where relevant the terms of any Goods Specification or Services Specification) are complete and accurate;
b) co-operate with us in all matters relating to the Goods and Services;
c) provide us, our employees, agents, consultants and subcontractors, with such access to your premises as may be required by us to assist with the provision of the Services and the supply of Goods
d) provide us with such information and materials (including where relevant third party parts or components required in connection with the Services) as we may reasonably require to supply the Services, and ensure that such information is accurate in all material respects;
e) obtain and maintain all necessary licences, permissions and consents which may be required for the Services before the date on which the Services are to start and/or for the Goods before the date that the Goods are to be delivered including but not limited to any export licences and/or military or governmental licences necessary for the import of the Goods (including any component parts) from any country of origin and export of the Goods (including any component parts) to any country of destination or intended destination; and
f) keep and maintain all materials, equipment, documents and other property belonging to us (including where relevant first articles) (ASG Materials) at your premises in safe custody at your own risk, maintain the ASG Materials in good condition until returned to us, and not dispose of or use the ASG Materials other than in accordance with our written instructions or authorisation. All ASG Materials shall remain our exclusive property.
7.2. If our performance of any of our obligations in respect of the Services is prevented or delayed by any act or omission by you or failure by you to perform any relevant obligation (Customer Default):
a) we shall without limiting our other rights or remedies have the right to suspend performance of the Services until you remedy the Customer Default, and to rely on the Customer Default to relieve us from the performance of any of our obligations to the extent the Customer Default prevents or delays our performance of any of our obligations;
b) we shall not be liable for any costs or losses sustained or incurred by you arising directly or indirectly from our failure or delay to perform any of our obligations as set out in this clause 7.2; and
c) you shall reimburse us on written demand for any costs or losses sustained or incurred by us arising directly or indirectly from the Customer Default.
8. Charges and Payment
8.1. The price for Goods and/or Services shall be the price set out in the Order. Except as set out in the Specification or Order, the price of the Goods is exclusive of all costs and charges of packaging, insurance, transport of the Goods, which shall be paid by you when you pay for the Goods to the extent that we agree to arrange transport of the goods on your behalf
8.2. We reserve the right to increase the price of the Goods or Services, by giving notice to you at any time before delivery, to reflect any increase in the cost of the Goods or Services to us that is due to:
a) any factor beyond our control (including foreign exchange fluctuations, increases in taxes and duties, and increases in labour, materials and other manufacturing costs);
b) any request by you to change the delivery date(s), quantities or types of Goods or Services ordered, or the Goods Specification or the Services Specifications; or
c) any delay caused by any instructions from you in respect of the Goods or Services or your failure to give us adequate or accurate information or instructions in respect of the Goods.
8.3. We shall be entitled to invoice you on or at any time after completion of delivery in accordance with clause <4.2>
8.4. Where our charges include any element of non- recurring costs, we shall be entitled to invoice you at any time following the date of the Order in respect of the same. Where the non- recurring costs relate to costs of tooling such tooling shall remain our exclusive property until such time as all non- recurring costs are paid in full. Until such time as payment is received in full any tools or tooling shall remain ASG Materials.
8.5. You shall pay each invoice submitted by us:
a) within 30 days of the date of the invoice; and
b) in full and in cleared funds to a bank account nominated in writing by us, and time for payment shall be of the essence of the Contract.
8.6. All amounts payable by you under the Contract are exclusive of amounts in respect of value added tax chargeable from time to time (VAT). Where any taxable supply for VAT purposes is made under the Contract by us to you, you shall, on receipt of a valid VAT invoice from us, pay to us such additional amounts in respect of VAT as are chargeable on the supply of the Services or Goods at the same time as payment is due for the supply of the Services or Goods
8.7. Without limiting any other of our rights or remedies, if you fail to make any payment due to us under the Contract by the due date for payment (Due Date), we shall have the right to charge interest and where applicable compensation on the overdue amount in accordance with the Late Payment of Commercial Debts (Interest) Act 1998.
8.8. You shall pay all amounts due under the Contract in full without any deduction or withholding except as required by law and you shall not be entitled to assert any credit, set-off or counterclaim against us in order to justify withholding payment of any such amount in whole or in part. We may, without limiting our other rights or remedies, set off any amount owing to us by you against any amount payable by us to you.
8.9. We shall be entitled to allocate all payments received from you to the oldest debt owed by you.
9. Intellectual Property Rights
9.1. All intellectual property rights of whatever nature and arising anywhere in the world which apply or arise in connection with the manufacture or supply of the Goods or supply of the Services shall to the extent not specifically set out in the Goods Specification or Services Specification with such detail so as to require no further knowledge or manufacturing input be our sole and exclusive property.
10. Confidentiality
You shall keep in strict confidence all technical or commercial know-how, specifications, inventions, processes or initiatives which are of a confidential nature and have been disclosed to you by us, our employees, agents or subcontractors, and any other confidential information concerning our business or products or services which you may obtain. You shall restrict disclosure of such confidential information to such of your employees, agents or subcontractors as need to know it for the purpose of discharging your obligations under the Contract, and shall ensure that such employees, agents or subcontractors are subject to obligations of confidentiality corresponding to those which bind you. This clause 10 shall survive termination of the Contract.
11. Limitation of Liability
11.1. Nothing in these Conditions shall limit or exclude our liability for:
a) death or personal injury caused by our negligence, or the negligence of our employees, agents or subcontractors
b) fraud or fraudulent misrepresentation;
c) breach of the terms implied by section 2 of the Supply of Goods and Services Act 1982 (title and quiet possession); or
d) breach of the terms implied by section 12 of the Sale of Goods Act 1979 (title and quiet possession).11.2 Subject to clause 11.1:
i) we shall under no circumstances whatsoever be liable to you, whether in contract, tort (including negligence), breach of statutory duty, or otherwise, for any loss of profit, or any indirect or consequential loss arising under or in connection with the Contract; and
ii) our total liability to you in respect of all other losses arising under or in connection with the Contract, whether in contract, tort (including negligence), breach of statutory duty, or otherwise, shall in no circumstances exceed the price paid under the Contract.
11.3. Subject to clause 11.1 we shall have no liability to you where any alleged defect results from any instructions or information provided by you.
11.4. Except as set out in these Conditions, all warranties, conditions and other terms implied by statute or common law are, to the fullest extent permitted by law, excluded from the Contract.
11.5. This clause 11 shall survive termination of the Contract.
12. Termination
12.1. Without limiting our other rights or remedies, we may terminate the Contract with immediate effect by giving written notice to you if:
a) you commit a material breach of your obligations under the Contract and (if such breach is remediable) you fail to remedy that breach within 28 days after receipt of notice in writing of the breach;
b) you suspend, or threaten to suspend, payment of your debts or are unable to pay your debts as they fall due or admit inability to pay your debts or (being a company) are deemed unable to pay your debts within the meaning of section 123 of the Insolvency Act 1986 or (being an individual) are deemed either unable to pay your debts or as having no reasonable prospect of so doing, in either case, within the meaning of section 268 of the Insolvency Act 1986 or (being a partnership) have any partner to whom any of the foregoing apply;
c) you commence negotiations with all or any class of your creditors with a view to rescheduling any of your debts, or you make a proposal for or enter into any compromise or arrangement with your creditors;
d) a petition is filed, a notice is given, a resolution is passed, or an order is made, for or in connection with your winding up (being a company);
e) any creditor or encumbrancer of yours attaches or takes possession of, or a distress, execution, sequestration or other such process is levied or enforced on or sued against, the whole or any part of your assets and such attachment or process is not discharged within 14 days;
f) an application is made to court, or an order is made, for the appointment of an administrator or if a notice of intention to appoint an administrator is given or if an administrator is appointed over you (being a company);
g) a floating charge holder over your assets (being a company) becomes entitled to appoint or has appointed an administrative receiver;
h) a person becomes entitled to appoint a receiver over your assets or a receiver is appointed over your assets;
i) any event occurs, or proceedings are taken, in respect of you in any jurisdiction to which the subject has an effect equivalent or similar to any of the events mentioned in clause 12.1(b) to clause 12.1(h) (inclusive); or
j) you suspend, threaten to suspend, cease or threaten to cease to carry on, all or substantially the whole of your business.
12.2. Without limiting our other rights or remedies, we may terminate the Contract with immediate effect by giving written notice to you if you fail to pay any amount due under the Contract on the due date for payment.
12.3. Without limiting our other rights or remedies, we shall have the right to suspend the supply of Services or all further deliveries of Goods under the Contract or any other contract between you and us if:
a) you fail to pay any amount due under the Contract on the due date for payment; or
b) you become subject to any of the events listed in clause 12.1(b) to clause
12.1. (j), or we reasonably believe that you are about to become subject to any of them.
12.4. You may terminate the Contract by giving written notice to us if we commit a material breach of our obligations under the Contract and (if such breach is remediable) we fail to remedy that breach within 28 days after receipt of your notice in writing of the breach
13. Consequences of Termination
On termination of the Contract for any reason:
13.1. you shall immediately pay to us all of our outstanding unpaid invoices and interest and, in respect of Services supplied but for which no invoice has yet been submitted, we shall submit an invoice, which shall be payable by you immediately on receipt;
13.2. you shall return all of the ASG Materials and any documents (including designs or drawings which relate to the supply of Goods and/or Services which have not been fully paid for. If you fail to do so, then we may enter your premises and take possession of them. Until they have been returned, you shall be solely responsible for their safe keeping and will not use them for any purpose not connected with the Contract;
13.3. the accrued rights and remedies of the parties as at termination shall not be affected, including the right to claim damages in respect of any breach of the Contract which existed at or before the date of termination or expiry;
13.4. clauses which expressly or by implication have effect after termination shall continue in full force and effect; and
13.5. you shall immediately pay to us our costs associated with part performance of the Contract including but not limited to the immediate payment of any outstanding non-recurring costs, the costs of raw materials purchased in connection with the Goods and/or Services and all costs associated with part finished Goods calculated as a percentage of the Goods price which we consider appropriate in our sole discretion.
14. Compliance with Relevant Requirements
14.1. You shall:
a) comply with all applicable laws, statutes, regulations, and codes relating to anti-bribery and anti-corruption including but not limited to the Bribery Act 2010 (Relevant Requirements);
b) not engage in any activity, practice or conduct which would constitute an offence under sections 1, 2 or 6 of the Bribery Act 2010 if such activity, practice or conduct had been carried out in the UK;
c) have and shall maintain in place throughout the term of the Contract your own policies and procedures, including but not limited to adequate procedures under the Bribery Act 2010, to ensure compliance with the Relevant Requirements and will enforce them where appropriate
d) promptly report to us any request or demand for any undue financial or other advantage of any kind received by you in connection with the performance of the Contract;
e) immediately notify us (in writing) if a foreign public official becomes your officer or employee or acquires a direct or indirect interest in your business (and you warrant that you have no foreign public officials as officers, employees or direct or indirect owners at the date of the Contract);
f) annually certify to us in writing your compliance with this clause 14 and all persons associated with it under clause 14.2. You shall provide such supporting evidence of compliance as we may reasonably request.
14.2. You shall ensure that any person associated with you who is performing services or providing goods in connection with any relevant Contract does so only on the basis of a written contract which imposes on and secures from such person terms equivalent to those imposed on you in this clause 14 (Relevant Terms). You shall be responsible for the observance and performance by such persons of the Relevant Terms, and shall be directly liable to us for any breach by such persons of any of the Relevant Terms.
14.3. Breach of this clause 14 shall be deemed a material breach under clause 12.1(a).
14.4. For the purpose of this clause 14, the meaning of adequate procedures and foreign public official and whether a person is associated with another person shall be determined in accordance with section 7(2) of the Bribery Act 2010 (and any guidance issued under section 9 of that Act), sections 6(5) and 6(6) of that Act and section 8 of that Act respectively. For the purposes of this clause 14 a person associated with you includes but is not limited to your subcontractors.
15. General
15.1. Force majeure:
a) For the purposes of these Conditions, Force Majeure Event means an event beyond our reasonable control including but not limited to strikes, lock-outs or other industrial disputes (whether involving the workforce of the party or any other party), failure of a utility service or transport network, act of God, war, riot, civil commotion, malicious damage, compliance with any law or governmental order, rule, regulation or direction, accident, breakdown of plant or machinery, fire, flood, storm or default of suppliers or subcontractors.
b) We shall not be liable to you as a result of any delay or failure to perform our obligations under the Contract as a result of a Force Majeure Event.
c) If the Force Majeure Event prevents us from providing any of the Services and/or Goods for more than 6 months, we shall, without limiting our other rights or remedies, have the right to terminate the Contract immediately by giving written notice to you.
15.2. Assignment and subcontracting:
a) We may at any time assign, transfer, charge, subcontract or deal in any other manner with all or any of our rights under the Contract and may subcontract or delegate in any manner any or all of our obligations under the Contract to any third party.
b) You shall not, without our prior written consent, assign, transfer, charge, subcontract or deal in any other manner with all or any of your rights or obligations under the Contract
15.3. Waiver and cumulative remedies:
a) A waiver by us of any of our rights under the Contract is only effective if it is in writing and shall not be deemed to be a waiver of any subsequent breach or default. No failure or delay by us in exercising any right or remedy under the Contract or by law shall constitute a waiver of that or any other right or remedy, nor preclude or restrict its further exercise. No single or partial exercise of such right or remedy shall preclude or restrict the further exercise of that or any other right or remedy.
b) Unless specifically provided otherwise, rights arising under the Contract are cumulative and to not exclude rights provided by law.
15.4. Severance:
a) If a court or any other competent authority finds that any provision of the Contract (or part of any provision) is invalid, illegal or unenforceable, that provision or part-provision shall, to the extent required, be deemed deleted, and the validity and enforceability of the other provisions of the Contract shall not be affected.
b) If any invalid, unenforceable or illegal provision of the Contract would be valid, enforceable and legal if some part of it were deleted, the provision shall apply with the minimum modification necessary to make it legal, valid and enforceable.
15.5. No partnership: Nothing in the Contract is intended to, or shall be deemed to, constitute a partnership or joint venture of any kind between any of the parties, nor constitute any party the agent of another party for any purpose. No party shall have authority to act as agent for, or to bind, the other party in any way.
15.6. Third parties:
a) Except as provided in clause 15.6(b), a person who is not a party to the Contract shall not have any rights under or in connection with it.
b) These Conditions are made for the benefit of us and the ASG Aerospace Group from time to time and any party in the ASG Aerospace Group may enforce these Conditions as if it were a party to the Contract.
15.7. Variation: Except as set out in these Conditions, any variation, including the introduction of any additional terms and conditions, to the Contract shall only be binding when agreed in writing and signed by us.
15.8. Governing law and jurisdiction: The Contract, and any dispute or claim arising out of or in connection with it or its subject matter or formation (including non-contractual disputes or claims), shall be governed by, and construed in accordance with, English law, and subject to clause 15.9 the parties irrevocably submit to the exclusive jurisdiction of the courts of England and Wales.
15.9. LCIA Arbitration: At our option any disputes arising out of or in connection with the Contract, including any question regarding its existence, validity or termination shall be referred to and finally resolved by Arbitration under LCIA Rules, which rules are deemed to be incorporated by reference to this clause. The number of arbitrators shall be one. The seat or legal place of arbitration shall be London and the language of arbitral proceedings shall be English.